Shutter and Shopfront.uk 0800 088 6248 Get a price
  1. Home
  2. Who it's for
  3. Light industrial workshops

What shutters does a light industrial workshop need?

A light industrial workshop usually needs a roller shutter on the main goods door and a separate steel door for staff. Materials and finished work go through the shutter by forklift, pallet truck or by hand, and people use the door. How often the shutter opens decides between a manual and an electric drive.

Workshop with a lathe, steel racking and a workbench, and a raised roller shutter onto an industrial estate

Should a workshop shutter be manual or electric?

Choose by how often it opens and what the curtain weighs. A door opened at the start and end of the day can be manual, at £1,068 to £2,340 inc VAT. A door opened through the day usually needs electric, at £1,740 to £3,900 on the same basis.

Count the openings on a busy day. One cycle is one open and one close, and wear follows cycles, not the calendar. Larger openings are quoted after survey.

Forklifts and pallet trucks can clip the guides and bottom rail, so size the opening with room to spare.

Do I need a separate door for staff?

Usually, yes. Guidance for offices and shops in England and Wales says loading doors and roller shutters are not normally suitable as final exits. It notes a possible exception for a small number of familiar staff in a normal-risk area, where the opening is unobstructed and immediately manually operable. Ask whoever does your fire risk assessment how that applies to a workshop.

A closed security shutter must not block a required escape route while people are inside. In England and Wales, see article 14 of the Regulatory Reform (Fire Safety) Order 2005. In Scotland, see regulation 13 of the Fire Safety (Scotland) Regulations 2006. In Northern Ireland, see regulation 13 of the Fire Safety Regulations (Northern Ireland) 2010.

A steel door set is £1,740 to £3,900 inc VAT.

Can I add a motor to my manual workshop shutter?

Yes, if the shutter is sound. Manual to electric conversion is £714 to £1,434 inc VAT.

An installer converting a manual shutter to power may become the responsible manufacturer. The complete machine is then assessed, with a technical file, instructions and a Declaration of Conformity. A motor's declaration alone does not cover the finished shutter.

Which openings does this usually involve?

OpeningWhat usually suits it
Main goods doorElectric industrial shutter sized to the load
Side door used at opening and closingManual roller shutter
Staff entranceSteel security door set
Manual shutter that now opens all dayManual to electric conversion, if the shutter is sound

Quick answers

Do I need planning permission for a shutter on an industrial unit?

It depends on the nation and the site. In England, Part 7 Class H rights can sometimes apply, subject to limits. Wales, Scotland and Northern Ireland have their own rules, so check with the planning authority.

Can dust or debris stop a shutter?

Yes. Anything in the guides or under the sensor can stop it. If the shutter still will not run after you have checked, stop and call.

How long does a new workshop shutter take?

The typical lead time for a new shutter is 2 to 3 weeks after survey sign-off. Nothing is ordered until you accept the quotation.

Have an opening to price?

Answer four quick questions and see a guide price straight away.

WhatsApp